摘要
分析了岭澳核电站投运初期在汽轮机启动过程中发生摩擦振动的原因,并介绍了为消除摩擦振动在维修方面所采取的措施。
The turbine friction vibration cause during the period of start-up and in the early time of commercial service in Lingao nuclear power station is analyzed, and the adopted measures to solve the problem are introduced.
出处
《汽轮机技术》
北大核心
2005年第5期389-390,367,共3页
Turbine Technology