沉管隧道的一种最终接头形式及施工方法 被引量:7

A type of final joint of immersed tube tunnels and its construction method
下载PDF
导出
摘要 最终接头是整个沉管隧道中的关键工序之一,干地施工法是最常用的一种最终接头施工方法。结合嘉兴电厂二期取水工程的具体特点,首次采用接头井的形式实现最终接头的干地施工。工程实践表明,结构的强度、刚度、稳定性、水密性均满足干地施工要求,大大降低了最终接头的施工风险,确保了施工质量。 The final joint is a key structure for an immersed tube tunnel and it is often constructed under a dry condition. In accordance with the features of the water intake project of Jiaxing 2nd stage power plant, a unique type of joint well was employed to realize the dry condition construction for the final joint. Practice of the project indicated that the strength, stiffness, stability and watertightness of the final joint met the requirements of dry condition construction. The method also decreased the construction risk and ensured the construction quality.
出处 《现代隧道技术》 EI 北大核心 2005年第5期66-70,共5页 Modern Tunnelling Technology
关键词 沉管隧道 最终接头 钢封门 止水 Immersed tunnel Final joint Steel diaphragm Water stop
  • 相关文献

参考文献7

  • 1周松 刘干伟 杨国祥.常洪沉管隧道施工技术概述[C]..城市交通隧道工程最新技术—2003上海国际隧道工程研讨会论文集[C].中国:上海,2003年..
  • 2沈秀芳 乔综召 陈鸿.上海外环隧道设计[C]..城市交通隧道工程最新技术—2003上海国际隧道工程研讨会论文集[C].中国:上海,2003年..
  • 3李侃,杨国祥.上海外环线越江沉管隧道工程技术概览[J].世界隧道,2000(5):32-37. 被引量:13
  • 4陈彬 傅德明 李向红.上海外环沉管隧道管段沉放施工技术研究[C]..城市交通隧道工程最新技术-2003上海国际隧道工程研讨会论文集[C].中国:上海,2003年..
  • 5上海隧道股份有限公司.杭州湾海底沉管隧道施工关键技术研究—技术鉴定资料[R].上海:上海隧道股份有限公司,2004..
  • 6O. Kiyomiya. Earthquake - resistant Design Features of Immersed Tunnels in Japan [ J ]. Tunneling and Underground Space Technology. 1995, Vol. 20, No. 4:463 - 475.
  • 7Nestor S. Rasmussen. Concrete Immersed Tunnels - Forty Years of Experience[ J ]. Tunneling and Underground Space Technology. 1997,Vol. 12,No. 1:33 -46.

共引文献13

同被引文献467

引证文献7

二级引证文献589

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部