期刊文献+

Analysis on Bearing Capacity of Tunnel-Type Anchorage of a Long-Span Suspension Bridge

Analysis on Bearing Capacity of Tunnel-Type Anchorage of a Long-Span Suspension Bridge
下载PDF
导出
摘要 Due to complicated rock structure and environment, a prototype test for a tunnel-type anchorage is infeasible. Based on the rock mass parameters from tests, a three-dimensional (3D) elastoplastic analysis was performed to simulate the influence of the construction procedure of Siduhe bridge with tunnel-type anchorage (TTA) in Hubei Province, China. The surrounding rock and concrete anchorage body were simulated by 8 nodes 3D brick elements. The geostatic state of the complex geometric structure was established with initial data. The in-situ concrete casting of the anchorage body and excavation of the rock mass were simulated by tetrahedral shell elements. The results show that the surrounding rock is in an elastic state under the designed cable force. The numerical overloading analysis indicates that the capacity of the surrounding anchorage is 7 times that of the designed cable force. The failure pattern shows that two anchorage bodies would be pulled out in the end. The maximum shear stress appears 10 m before the back anchorage face. The maximum range influenced by the TTA under ultimate loads is about 16 m. Due to complicated rock structure and environment, a prototype test for a tunnel-type anchorage is infeasible. Based on the rock mass parameters from tests, a three-dimensional (3D) elastoplastic analysis was performed to simulate the influence of the construction procedure of Siduhe bridge with tunnel-type anchorage (TTA) in Hubei Province, China. The surrounding rock and concrete anchorage body were simulated by 8 nodes 3D brick elements. The geostatic state of the complex geometric structure was established with initial data. The in-situ concrete casting of the anchorage body and excavation of the rock mass were simulated by tetrahedral shell elements. The results show that the surrounding rock is in an elastic state under the designed cable force. The numerical overloading analysis indicates that the capacity of the surrounding anchorage is 7 times that of the designed cable force. The failure pattern shows that two anchorage bodies would be pulled out in the end. The maximum shear stress appears 10 m before the back anchorage face. The maximum range influenced by the TTA under ultimate loads is about 16 m.
出处 《Journal of China University of Geosciences》 SCIE CSCD 2005年第3期277-282,共6页 中国地质大学学报(英文版)
关键词 tunnel-type anchorage suspension bridge elasto-plastic analysis bearing capacity tunnel-type anchorage, suspension bridge, elasto-plastic analysis, bearing capacity
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部