摘要
三峡工程是当今世界上最大的水利枢纽。在三峡二期工程的6年建设中,不仅进一步推广了一期工程的科技成果,而且广泛引进、研究和应用了国内外先进技术和工艺:如防渗墙施工技术、大规模水平预裂爆破技术、混装炸药车技术、混凝土快速施工技术、塔带机浇筑技术、新型模板技术、钢筋机械连接技术、混凝土综合温控技术、沥青混凝土心墙施工技术、压力钢管自动焊接技术、多级船闸人字门联合调试技术、三期双戗堤截流技术等,成功地攻克了施工中的各项难题,取得了巨大的综合经济效益。
Three Gorges project is the largest hydraulic project in the world today. During the 6 years of construction of the second stage works of the Three Gorges project, the technieal aehievement gained in the first-stage works have been promoted and more new technologies and know-how from both China and abroad have been broadly introduced, studied and applied. Such technologies as construction of cut-off wall, large-scale horizontal pre-split hlasting, mixed-loaded dynamite trucks, rapid concreting, concreting by tower and bell-conveyor, newly developed tormwork, mechanical reinforcement connection, combined concrete temperature control method, construetinn of asphalt concrete core wall, automatic welding of penstock, joint adjustment of mile gates of the multi-stage ship-lock and the third stage river closure by double prop weir. Many technical problems have been successfully tackled during construction work and great overall economic benefits have been achieved.
出处
《水力发电》
北大核心
2005年第10期8-13,共6页
Water Power
关键词
新技术
工程施工
围堰
大坝
土石开挖
混凝土
金属结构安装
三峡二期工程
new technology
construction
eofferdam dam: roek and earth excavation
concrete
erection of gates and hoists
secondstage works of Three Gorges project