8Lam T.Build Strategy Development,U.S.Department of the Navy Carderock Division,Navy Surface Warfare Center,1994.
二级参考文献32
1现代造船工程编写组.现代造船工程[M].哈尔滨:哈尔滨工程大学出版社,1998..
2ANDERSON D M PINE J B PINEII B J 冯涓 等.21世纪企业竞争前沿——大批量定制 模式下的敏捷产品开发[M].北京:机械工业出版社,1999..
3DAVIS S PINEII B J 操云甫 等.大批量定制:企业竞争的新前沿[M].北京:中国人民大学出版社,2000..
4Clark J, Lamb T. Build Strategy Development[J]. Journal of Ship Production, 1996,12(3):198.
5Koenig P C, Christensen W L. Development and implementation of model work breakdown structure in naval construction: acase study[J]. Journal of Ship Production, 1999, 15(3): 1364145.
6Scott J A, Todd D S, Sen P. An evolution approach to the scheduling of ship design and production process[Z].1998 Elsevier B.V. : 3514-357.
7ANDERSON D M. Build-to-order & mass customization,the ultimate supply chain management and lean manufacturing strategy for low-cost on-demand production without forecasts or inventory[M]. CIM Press,2002.
8SPRING M, DALRYMPLE J F. Product customization and manufacturing strategy[J]. International Journal of Operations & Production Management,2000, 20(4) :441-467.
9DURAY R,WARD P T, MILLIGAN G W, BERRY W L.Approaches to mass customization., configuration and empirical validation[J]. Journal of Operations Management, 2000, 18(6):605-625.
10ZIPKIN P. The limits of mass customization[J]. Sloan Management Review,2001,42(3) : 81-87.
10YE Xin tong, XIANG Xu meng, SHI Jun liu, LEI Wu, Resource organizing in the manufacturing grid[A]. The 9th International conference on computer supported cooperative work in design proceeding, 2005. (2): 1071-1076.