摘要
比较分析了用于隧道衬砌的全液压模板台车和简易衬砌台车的施工方法、设备配置、洞内布置、劳动力配置、工序循环时间等情况,最后对两者不同的使用条件提出了看法。
The article makes a comparison between the full-hydraulic steel formworks lining trolleys and simple steel formworks lining trolleys in such terms of construction methods, equipment allocations, inside tunnel arrangements, manpower organizations and cycle durations. The article also provides some suggestions on the different application conditions of the two types of lining trolleys.
出处
《隧道建设》
2005年第6期42-43,46,共3页
Tunnel Construction
关键词
全液压模板台车
简易衬砌台车
隧道衬砌
full-hydraulic steel formworks lining trolley
simple steel formworks lining trolley
tunnel lining