3Wang W, Brunn P. An effective genetic algorithm for job shop scheduling[J]. Proc Instn Mech Engrs,2000(14) :293 - 300.
4Aravindan P, Sreenivasa P. Comparative evaluation of genetic algorithms for job- shop scheduling [J]. Production Planning & Control, 2001 (12): 560 - 574.
5Ponnambalam S G, Ramkumar V,Jawahar N. A multiobjective genetic algorithm for job shop Scheduling[J]. Production Planning & Control, 2001 (12): 764 - 774.
6Stephanie Rebain, Marc E McDill. A mixed - integer formulation of the minimum patch size problem[J]. ProQuest Agriculture Journals,2004(8) :608 - 617.
7Suleyman, Karabuk. Modeling and optimizing transportation decisions in a manufacturing supply chain [ J ], Transportation Research,2006(2): 1 366 - 1 375.
8Bilkay O,Anlagan O. Job shop scheduling using fuzzy logic[J],International Journal of Advanced Manufacture Technology,2005(23) :606 - 619.