摘要
本文探讨了污水处理厂设计与建设中需予以重视的几个问题,主要在垃圾渗滤液对污水处理厂的运行过程的影响、污泥产率及二沉池水力负荷等工艺参数的选择方面做了详细的分析和探讨,并提出了相应的解决措施。
Some problems about design and construction of wastewater treatment plant are discussed such as the influence of leachate on the removal effficiency,the parameter selecting of sludge yield index and hydraulic loading of secondary clarification, and the corresponding measures are offered.
出处
《福建建设科技》
2005年第5期60-62,共3页
Fujian Construction Science & Technology
关键词
污水处理
设计
垃圾渗滤液
污泥产率
水力负荷
wastwater treatment
design
leachate
sludge yield index
hydraulic loading