武家塔露天煤矿露天—井工联合开采方案 被引量:7

Project of opencast & underground mining of Wujiata Open-pit Mine
下载PDF
导出
摘要 为了改善露天矿经济效果,发挥规模效益,根据地质条件、煤炭市场需求等条件,确定该矿合理的生产能力应扩大为300万t/a,因此,需要对该矿后续开采方案进行研究,针对该矿1-2#和2-2#两个可采煤层,为提高煤炭资源回收率,减少基建工程量和外排量,采用多种可行方案优选法,提出了在露天矿坑的坑底打斜,用井工开采2-2#煤层的开采方案,并对井工开采工艺、井巷掘进工程量、工作面布置、坑下斜井合理移动步距进行了确定。论述了在武家塔露天煤矿采用露天与井工开采并存的可行性、必要性和理论意义。联合开采方案在技术上是可行的、经济上是合理的。 To improve Wujiata Open-pit mine economic situation and give full play to scale benefit, the reasonable production rate of the mine should be enlarged to 300 × 10^4t/a, according to the geological condition and coal market. So, the new mining projects must be studied. For the mine's two coal seams No1-2^# and No2-2^#, and for increasing the recovery rate of coal,and decreasing the capital construction of the soil and rock, we use the multi-projects optimizing method and put forward the exploitation project that uses the underground mining for 2-2^# coal seam and dig a inclined well in open-pit. And we design the mining technology, the volume of laneways, laying work surface, and the reasonable move distance of inclined well in open-pit. We discussed the principle and essentiality and feasibility of using the opencast & underground mining in Wujiata Open-pit Mine. The opencast & underground mining is reasonable in economy and feasible in technology.
出处 《辽宁工程技术大学学报(自然科学版)》 CAS 北大核心 2006年第1期10-13,共4页 Journal of Liaoning Technical University (Natural Science)
基金 辽宁省教育厅基金资助项目(2004F050)
关键词 武家塔露天煤矿 露天-井工联合开采 坑底斜井 移设步距 开采原理 WUJIATA Open-pit Mine project opencast & underground mining inclined well in open-pit move distance mining principle
  • 相关文献

参考文献5

二级参考文献2

  • 1宋子岭 白润才 谢雨治.Vulcan软件在我国露天矿应用前景.辽宁工程技术大学学报,2001,20(2):344-347.
  • 2中国矿业大学.露天采矿手册[M].北京:煤炭工业出版社,1987..

共引文献40

同被引文献30

引证文献7

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部