期刊文献+

斜拉桥施工过程的非线性仿真分析研究 被引量:6

Nonlinearity and Emulation Analysis for Construction Sequences of Cable-stayed Bridges
下载PDF
导出
摘要 介绍了斜拉桥施工过程的索力确定与优化方法。精确考虑结构的几何非线性、混凝土的收缩徐变等效应,对大跨度混凝土斜拉桥施工全过程进行仿真分析与研究。编制了相应的计算程序,用于分析湖南某大桥,获得了较好的结果,为该桥的施工监控提供了理论依据,确保了该桥的顺利合龙。 The determination and optimization of the cable forces for construction sequences of cablestayed bridges has been studied. Considering the influence of geometric nonlinearity, shrinkage and creep of concrete, a method is introduced, it can solve emulation analysis for construction sequences of long-span cable-stayed bridges. A program is developed upon this method. Engineering application of the developed program in a bridge of Hunan demonstrates the feasibility of the proposed method.
出处 《长沙交通学院学报》 2006年第1期17-21,62,共6页 Journal of Changsha Communications University
关键词 斜拉桥 非线性 收缩 徐变 索力 cable-stayed bridge nonlinearity shrinkage creep cable force
  • 相关文献

参考文献4

二级参考文献4

共引文献386

同被引文献27

引证文献6

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部