摘要 针对目前饱和软土中钻孔灌注桩竖向承载力时间效应研究不多的情况,结合现场试验对饱和软土钻孔灌注桩承载力时间效应机理进行了分析。结果表明:随着时间增长,桩周被扰动土的结构强度逐渐恢复,摩阻力逐渐增加,钻孔灌注桩竖向承载力呈现一定的时效性,但不宜扩大桩竖向承载力的时效作用,时间效应可对桩竖向极限承载力产生10%以上的影响。 The research of time-effect on vertical beating capacity of single drilled grouting pile in saturated soft soil is few at present. Through analyzing the mechanism of time-effect on bearing capacity of single drilled grouting pile in saturated soft soil and in-situ test, it shows that the frame intensity of the disturbed soil around the pile come back lentamente with the time went by. The friction between the soil and the pile enhanced slowly, it shows stated time-effect. The research indicates that the time-effect on vertical beating capacity of single drilled grouting pile in saturated soft soil can't be enlarged at actual test, the time-effect can affect'more than 10 percent of the ultimate beating capacity of single pile.
出处 《岩土力学》 EI CAS CSCD 北大核心 2006年第3期471-474,共4页 Rock and Soil Mechanics
关键词 软土 钻孔灌注桩 时间效应 极限承载力 soft soil drilled grouting pile timeweffect ultimate bearing capacity
  • 相关文献

参考文献7

二级参考文献22

  • 1吴永红,王成华.工作荷载作用下群桩沉降比的估算方法[J].岩土工程学报,1993,15(1):86-90. 被引量:4
  • 2梁治安,陈静曦.试论水泥喷射搅拌桩的单桩承载力测试[J].岩土力学,1996,17(1):71-75. 被引量:10
  • 3秦惠纪,张仁.桩承载力的时间效应[J].结构工程师,1996,12(1):20-23. 被引量:1
  • 4胡中雄.饱和软粘土中单桩承载力随时间的增长[J].岩土工程学报,1985,7(3):58-61.
  • 5郑刚 顾晓鲁.减沉桩承载机理的试验与计算分析[A]..第四届全国桩基工程学术会议论文集[C].武汉:中国建材工业出版社,1994..
  • 6吴永红.[D].天津大学,2001.
  • 7郑刚.[D].天津:天津大学,2000.
  • 8桩基工程手册编写委员会.桩基工程手册[M].北京:中国建筑工业出版社,1996..
  • 9上海市建设委员会,关于粉喷桩及深层搅拌桩在建筑工程地基处理中应用问题的通知 (沪建 ( 97)第 0 3 72,1997年
  • 10姚笑青,硕士学位论文,1997年

共引文献126

同被引文献285

引证文献38

二级引证文献140

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部