期刊文献+

水、火电机组协调控制在江西电网的实现 被引量:1

Implementation of Coordinating Control between Hydro Units and Thermal Units in Jiangxi Power Grid
下载PDF
导出
摘要 介绍了江西电网水、火电机组协调控制的实现方法,提出了对水、火电机组分类并施以不同控制策略的新思路:让水电机组调节ACE、火电机组跟踪负荷的趋势分量,可以发挥各自的特点,其效果在实用中得到了证明。 The implementation of coordinating control between hydro units and thermal units in Jiangxi power grid is introduced in this paper, a new strategy which hydro units adjust area control error(ACE) and thermal units trace the trend components of load is also presented. The classification takes advantage of each kind of units and its effectiveness is proved by actual application.
出处 《华中电力》 2006年第2期11-14,共4页 Central China Electric Power
关键词 火电机组 协调控制 AGC hydro, thermal units coordinating control AGC
  • 相关文献

参考文献4

  • 1Daniel J. Trudnowski,Warren L. McReynolds, Jeffery M.Johnson.Real-Time Very Short-Term Load Prediction for Power-System Automatic Generation Control[J]. IEEE Trans on Power System, Vol 9, No 2, March 2001.
  • 2高宗和,丁恰,温柏坚,姚建国.利用超短期负荷预报实现AGC的超前控制[J].电力系统自动化,2000,24(11):42-44. 被引量:46
  • 3李端超,谢恒,江立山,等.安徽电网实时发电控制系统设计及实现[C].第二十六届中国电网调度运行论文集.1999.
  • 4K. Liu, S. Subbarayan, R.R. Shoults, M.T. Manry, C.Kwan, F.L. Lewis, J. Nacearino, Comparison of Very Short-Term Load Forecasting Techniques[J]. IEEE Trans on Power System,Vol 11, No 2, 1996.

二级参考文献2

共引文献45

同被引文献9

引证文献1

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部