水轮机调速器与电网负荷频率控制——(三)区域电网交换功率控制仿真研究 被引量:2

Hydro-turbine Governor and Grid Load Frequency Control Part Three Research on Exchange Power Between Area Grids
下载PDF
导出
摘要 在现代电力系统中,要很好地维持电网频率稳定在一定范围内,实现整个互联电网有功功率的瞬间平衡,各区域电网必须调整好各自内部的有功平衡,同时,还要维持联络线上的计划交换功率,需要通过监测联络线潮流和电网频率来决定合适的发电控制。文中对在控制性能评价标准(CPS)考核下的区域电网交换功率控制进行了初步的仿真和实时试验研究。 In the present power system, area grids must maintain arranged exchange power of interconnection lines and adjust interior active power balance, so as to maintain the grid frequency within a set range and realize the transient equilibrium of the whole interconnected network; at the same time, it is necessary to monitor the interconnection line current and grid frequency for the determination of appropriate power generation control. This paper describes the preliminary simulation and real time test research of exchange power control between area grids under the CPS.
出处 《水电自动化与大坝监测》 2006年第2期13-19,共7页 HYDROPOWER AUTOMATION AND DAM MONITORING
关键词 电网负荷频率控制 区域电网交换功率 控制性能标准 适应式变参数 grid load frequency control exchange power between area grids control performance standard (CPS) adaptive variable parameters
  • 相关文献

参考文献5

二级参考文献6

共引文献174

同被引文献29

引证文献2

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部