期刊文献+

乌鞘岭隧道辅助坑道的设置 被引量:9

Design and construction of the access shafts and drifts for Wushaoling tunnel
下载PDF
导出
摘要 乌鞘岭隧道为目前已贯通的我国最长的铁路隧道,长20.05 km,因其地质条件复杂、工期极其紧张,在方案设计时设置了多座辅助坑道,工程规模巨大,引起了国内外地下工程界的瞩目。文章介绍了越岭隧道的长斜井、深竖井、平导、横洞的设计和施工情况。 Wushaoling tunnel with a length of 20 050 m is the longest tunnel in China at present. It has been the focus of world attention in the underground engineering circles for its complex geological conditions, strict time limit of construction and consequent scheme of access shafts and drifts. The paper reviews the design and construction of the long inclined shafts, the deep vertical shaft, the parallel adit and the access adit for the tunnel.
作者 李国良
出处 《现代隧道技术》 EI 北大核心 2006年第2期38-43,共6页 Modern Tunnelling Technology
关键词 铁路隧道 辅助坑道 设置 Railway tunnel Access shafts and drifts Layout
  • 相关文献

参考文献4

  • 1马中等撰稿张坤民主笔可持续发展论[M].
  • 2经济合作与发展组织编,施涵,陈松.环境项目和政策的经济评价指南[M]中国环境科学出版社,1996.
  • 3王颖,朱大奎.海岸地貌学[M]高等教育出版社,1994.
  • 4Jan Rotmans,Marjolein Asselt. Integrated assessment: A growing child on its way to maturity[J] 1996,Climatic Change(3-4):327~336

同被引文献69

引证文献9

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部