1Chakravorty,Satya S.Atwater,J.Brian.The impact of free goods on the performance of drum-buffer-rope scheduling systems[J].International Journal of Production Economics,2005,95(3).
2Riezebos,J.Korte,G.J.Land,M.J.Improving a practiceal DBR buffering approach using Workload Control[J].International Journal of Production Research,2003,41 (4).
3Sivasubramanian,R.Selladurai,V.Rajamramasamy,N.The effect of the drum-buffer-rope (DBR) approach on the performance of a synchronous manufacturing system(SMS)[J].Production Planning & Control,2000,1 (8).