龙滩水电站右岸坝肩锚固洞施工难点及对策 被引量:3

Construction Difficulties and Conutermeasures for Braced-tunnel on the Abutment Right Bank of Longtan Hydropower Station
下载PDF
导出
摘要 龙滩水电站右岸岸坡地质条件异常复杂,采用锚固洞塞的加固方案对边坡稳定进行治理。针对此工程设计要求高、技术难度大等特点,对爆破控制、洞室开挖出渣、锚杆注浆等施工方法进行了改进,提高了施工工效,加快了施工进度,最终提高了经济效益。 Due to the very complex geological condition on the right bank of Long-tan hydropower station, the side slope has been treated with anchored-tunnel in order to get its stability. Aiming at high design requirement and great technical difficulties, construction methods such as blasting control, excavating and mucking in the tunnel and grout injection in the holes with anchor have been improved on so as to advance construction efficiency, quicken construction schedule and increase economical benefits finally.
出处 《水力发电》 北大核心 2006年第4期35-36,共2页 Water Power
关键词 锚固洞加固 爆破控制 出渣 锚杆注浆 龙滩水电站 anchored-tunnel bracing blasting control mucking injection in the anchor holes Longtan Hhydropower Station
  • 相关文献

参考文献1

共引文献2

同被引文献8

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部