期刊文献+

十三陵蓄能电站上水库自动监测系统的设计及运行

Title:Design on the monitoring automation system and its operation in Shisanling pumped storage station
下载PDF
导出
摘要 由于十三陵蓄能电站上水库地处蟒山之巅,所在山体地质条件复杂,施工期埋设了大量的监测仪器,原有人工监测系统效率低、资料分析的同步性差。2002年5月,对其进行了自动化改造,现已有一套符合其特点的自动化监测系统。十三陵上水库水工建筑自动监测系统已正常运行了三年,同时也存在着问题,有待于进一步的探讨和改进。 The upper reservoir of Shisanling pumped storage station is located on the mountain top of Mangshan, where the geological condition is quite complex. During the station construction a large quantity of monitoring instruments were embedded. The original artificial monitoring system has worked inefficiently. In May, 2002, it was rebuilt to a new automatic system suitable for its own features. Now, the system has operated normally for 3 years, simultaneously some problems needed as well for further improvement.
作者 牛香芝
出处 《大坝与安全》 2006年第1期8-10,共3页 Dam & Safety
关键词 自动监测系统 测量模块 测控装置 传感器 钢弦式 差阻式 可变电阻式 十三陵蓄能电站 automatic monitoring system measuring module surveying and controlling equipment sensor steel-wire differential resistance changeable resistance Shisanling pumped storage station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部