黑河水利枢纽右岸溢洪洞进口引渠右岸边坡的开挖方案,是影响该工程质量和造价的突出问题。通过水工试验,研究在满足泄洪、水流流态的前提下,优化和确定引渠进口岸坡的连接形式,达到减小开挖量,节省投资,缩短工期的目的。
The excavation of the right slope of the approach channel for the inlet of the spillway tunnel in Heihe Water Control Project has a significant effect upon the construction quality and the cost of the project. Based on some hydraulic model tests, a study is made to optimize and determine the conjunction type for the bank slope of the approach channel of the inlet under the precondition to meet the relevant requirements of both the flood discharge and the flow regime, so as to reduce the excavation, save the investment and shorten the construction period concerned.