摘要
本文针对我国金矿地下充填现状,对胶结充填工艺中存在的某些问题进行了研究和探讨,并提出了全尾砂泵压充填新工艺的具体实施方法;讨论了充填对岩体移动的作用。
According to the present condition of cut and fill stoping in gold mining,some problems of cementing filling technology in underground mining are discussed in this paper.The methods of carrying out the new technology of pump pressure filling with tailing sand are proposed and the effects of backfill on rock mass displacement are discussed.
出处
《黄金》
CAS
北大核心
1996年第9期30-33,共4页
Gold
关键词
金矿
胶结充填法
采矿
gold mining
cementing fill
rock mass displacement and deformation