摘要
论文中对大纯滞后系统数学模型进行了辩识,并对其鲁棒性进行了研究,系统设计与调试结果,证明该方法是可行的。
This paper analyzed the mathematical model of large lime delay process system and researched on the robustness. The method that have been proven by system designing and test result is workable.
出处
《现代制造技术与装备》
2006年第1期43-45,共3页
Modern Manufacturing Technology and Equipment
关键词
大纯滞后系统
系统辩识
鲁棒性
Large time delay process system, Identification, Robustness