期刊文献+

全预应力锚杆机械锚固装置的设计与应用 被引量:5

Design and Application of Mechanical Anchoring Device of Full Pre-stressed Bolt
下载PDF
导出
摘要 针对目前地下工程中广泛使用的螺纹钢锚杆支护存在的预紧力差、预应力长度短的问题,设计制造了全预应力螺纹钢锚杆机械锚固装置,有效加大了锚杆预应力段的长度,提高了锚杆的预紧力,解决了施工锚杆后因爆破震动或矿压显现造成的托盘反复松动问题。现场应用和矿压观测表明,全预应力锚杆支护能适应恶劣条件,有效控制围岩的变形。 Aiming at screw steel holt which is widely used in underground engineering and has some disadvantages such as low pre-tension and short pre-stressed area, the author designed mechanical anchoring device. It improved obviously the length of pre-stressed and pre-stressed, which can effectively solv the problem of cyclic loosing pallet by explosion or rock behavior. After our testing and locale application, the results indicated that it can well adapt for bad rock conditions.
出处 《探矿工程(岩土钻掘工程)》 2006年第5期42-43,共2页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 全预应力 机械锚固装置 高预紧力 围岩稳定性 full pre-stressed mechanical anchoring device higher pre-tension stability of surrounding rocks
  • 相关文献

参考文献4

二级参考文献9

共引文献251

同被引文献21

引证文献5

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部