摘要
春、秋季节是禽流感等呼吸性传染疾病可能暴发的危险时段,负压隔离病房专用于收治呼吸道传染病病人,但目前我国尚无负压隔离病房设计及施工验收规范。根据国内外的相关标准,对两家传染病医院(分别为新建和改建)进行了实际测试,对负压隔离病房设计和建造中在负压控制方面存在的问题进行了总结分析,并提出了改进建议。
The spring and autumn are the high risk seasons for H5N1 avian influenza and other respiratory infection to seriously outbreak. All provinces and large cities are preparing or have prepared emergent negative pressure isolation wards to collect the possible infected patients in China. But so far there is no official published design and construction code for negative pressure isolation wards in China. Based on the criterions of both domestic and the foreign design guideline, tests two infectious disease hospitals (one is newly built, the other is rebuilt), sums and analyses the issues in the design and construction process of negative pressure control system for this kind of isolation wards and presents some suggestions.
出处
《暖通空调》
北大核心
2006年第5期39-43,共5页
Heating Ventilating & Air Conditioning
关键词
负压隔离病房
压力控制
负压梯度
换气次数
negative pressure isolation ward, pressure control, pressure gradient, air changes