摘要
对客运专线与箱梁发展及特点进行了概述。介绍了大型工装设备配置。对预制架设技术要点进行了详细阐述,分析了箱梁预制现场管理,以推广该铁路客用专线箱梁预制架设施工方案。
It illustrates characteristic and development of passenger line and box-beam generally, introduces collocation of large frock facility and illustrates technical points, and analyzes field management of pre-casting Dox-beam to spread construction plan of pre-casting box-beam for railway passenger line.
出处
《山西建筑》
2006年第12期291-292,共2页
Shanxi Architecture
关键词
箱梁
混凝士
钢筋笼
模板
预应力
box-beam, concrete, steel cage, follow board, inherent stress