3Steinert C. Smoke and beat production in tunnel fires [ A ]. The international conference on fires in tunnels [C]. Boras, Sweden: 1994,10:123 - 137.
4Ingason H, GUSTAVSON S, Dahlberg M. Heat release rate measurements in tunnel fires[ P]. 1994.
5Barber C, Gardiner A, Law M. Structural fire design of the Oresund tunnel[ A]. Proceedings of the international conference on fires in tunnels [ C ]. Boras, Sweden: 1994,10:313 - 332.
6张曙光.CRHl动车组[M].北京:中国铁道出版社,2008:5-20.
7J. M. Chen, X. L. Yao, S. P. Li. Study on the influ- ence of ventilation condition on the heat release rate of the CRH passenger rail car [ J ]. Procedia Engineering, 2013,52(4) :447-453.
8中华人民共和国铁道部.铁路旅客运输规程[s].铁运[1997]101号,1997.
9Tianjin Fire Research Institute, Study on Large-scale Underground Shopping Mall Fire[ R]. 1999.
10Haukur Ingason, Ying Zhen Li. Model scale tunnel fire tests with longitudinal ventilation [ J ]. Fire Safety Jour- nal. 2010, 45(6-8) :371-384.