杭州湾跨海大桥南滩涂区承台钢吊箱围堰设计与施工 被引量:5

Design and Construction of Steel Boxed Cofferdams for Pile Caps of Hangzhou Bay Sea-Crossing Bridge in Tidal-Flat Area on South Bank
下载PDF
导出
摘要 杭州湾跨海大桥南岸滩涂区宽9.7 km,引桥采用栈桥法施工,下部结构为钻孔桩基础。滩涂区软弱地层厚,地形多变,地下局部有浅层气,潮汐对承台施工影响很大,施工条件复杂。主要介绍滩涂区承台吊箱围堰设计和施工技术。 The tidal-flat area on the south bank of Hangzhou Bay Sea-Crossing Bridge measures about 9.7 km wide. The approach spans of the Bridge there are constructed with construction trestle method, and the foundations of substructure of the approach spans are used with bored piles. In the tidal-flat area, the soft stratum is thick, landform is variable, there is shallow gas stratum under local parts of the ground, the tides affect a great deal the construction of the pile caps, and in a word, the construction conditions of the pile caps are complicated. In this paper, the design and construction techniques for the steel boxed cofferdams for construction of the pile caps in the tidal-flat area are mainly dealt with.
出处 《桥梁建设》 EI CSCD 北大核心 2006年第3期65-67,共3页 Bridge Construction
关键词 承台 钢吊箱围堰 设计 施工 pile cap steel boxed cofferdam design construction
  • 相关文献

同被引文献22

引证文献5

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部