摘要
对落脚河水电站钢筋混凝土岔管进行了三维有限元分析.计算了在施工和运行过程中的6种组合工况下钢筋混凝土岔管的应力和变形.同时,经分析认为在岔管相贯部位采取了加腋措施,可有效缓解岔管部位的应力集中.
Three-dimensional finite element analysis for the reinforced concrete bifurcation pipe in Luojiaohe Hydropower Station is carried out. The stress and deformation of the reinforced concrete bifurcation with six combined operating conditions in the phases of construction and operating are calculated. Meanwhile, the intersection part of the bifurcation pipe is haunched, which helps to relief the stress concentration of the bifurcation pipe.
出处
《水利水运工程学报》
CSCD
北大核心
2006年第2期47-50,共4页
Hydro-Science and Engineering
关键词
混凝土岔管
应力
变形
有限元分析
落脚河水电站
concrete bifurcation pipe
stress
deformation
finite element analysis
Luojiaohe Hydropower Station