探讨了6m焦炉单炉产量低的影响因素,从操作上总结了提高单炉产量的方法,并在实践中加以应用。
The factors causing low production capacity of single chamber of the 6m-coking oven are discussed , and the measures to raise single chamber capacity from production operations are summarized, which have been applied in real production.