摘要 主要介绍了上海地铁明珠线蓝村路站-浦东南路站区间隧道联络通道、泵站采用水平冻结加固情况下,隧道支护及结构施工过程,分析了隧道内矿山法施工旁通道对地表及隧道结构产生的影响及解决措施,指出了矿山法施工技术在市政及地铁工程施工中的技术可行性。 The article presents the reinforcement and structural construction of the cross tunnel and pump station of the running tunnel between Lancun Rd station and Pudongnan Rd station of Mingzhu Line of Shanghai Metro, which are assisted by horizontal freezing. The article analyzes on the influence on the ground surface and turmel structure imposed by the construction of the cross tunnel and pump station by means of mining method and concludes that it is technically feasible to adopt the mining method in the Metro works.
作者 张晖
出处 《隧道建设》 2006年第3期58-59,94,共3页 Tunnel Construction
关键词 水平冻结 隧道支护 结构施工 horizontal freezing tunnel reinforcement structural construction
  • 相关文献

参考文献2

  • 1陶龙光 巴肇伦.城市地下工程[M].北京:科学出版社,1999..
  • 2陈仲颐 周景星 等.土力学[M].北京:清华大学出版社,1997..

共引文献18

同被引文献38

引证文献4

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部