摘要
超化煤矿为减少综采搬家次数,缓解矿井接替紧张,实现矿井高产高效,在21051综采面成功实施了跨大巷连续回采。
In order to reduce the combined to adopt to move out the number of times, alleviate the mineral well to take over the strain, carry out the mineral well high produce efficiently, across the big way continuous mining is implemented successfully in No.21051 Full Mechanized Mining Caving Face.
出处
《煤炭技术》
CAS
2006年第7期37-38,共2页
Coal Technology
关键词
皮带
溜煤眼
跨大巷
leather belt
slip away the coal hde
across the big lane