吉林台一级水电站面板堆石坝混凝土面板施工 被引量:3

Construction of Concrete Faced Rock-fill Dam of Jilintai-I Hydropower Station
下载PDF
导出
摘要 新疆吉林台一级水电站位于北疆高寒地区,混凝土面板堆石坝最大坝高157m,坝顶长度419m,面板面积7.53万m2,面板厚80 ̄30cm,采用无轨滑模,分三期进行浇筑。面板钢筋混凝土浇筑、接缝止水和裂缝处理的施工工艺合理,面板施工质量优良,可供有关工程参考。 The dam site of the Jilintai-Ⅰ hydropower station is in the high-cold zone in the north part of Xinjiang. The maximum height of the dam is 157m;the length of the top of dam is 419m; the area of the slab is 753000sq. meters; the slab concrete whose thickness is 80cm~30cm is C30W12F300 and the polypropylene fibre is added to the concrete, which is poured by trackless slip form and in three-stage way. The impervious material is the new type of GB series. Technique of reinforced concrete of concrete slab,water-seal of joint and treatment of fissure is reasonable and the construction of slab is excellent. Other projects can take it as reference.
作者 唐懿
出处 《水力发电》 北大核心 2006年第6期40-43,共4页 Water Power
关键词 混凝土面板堆石坝 周边缝 垂直缝 止水材料 施工 吉林台一级水电站 rock-fill dam concrete slab peripheral fissure vertical joint impervious material construction Jilintai-Ⅰ hydropower station
  • 相关文献

参考文献1

  • 1潘家铮 何王景.中国大坝50年[M].北京:中国水利水电出版社,2000..

共引文献60

同被引文献119

引证文献3

二级引证文献81

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部