上向分层胶结充填采矿法在侯庄矿区的应用 被引量:10

Application of Upwards Lamination Stoping-cemented Fill Method at Houzhuang Mining Area
下载PDF
导出
摘要 根据侯庄矿床-160m水平以上矿体赋存条件及地表不允许塌陷的状况,提出了一步房、二步房上向分层胶结充填采矿法,一步房胶固粉尾砂胶结充填,二步房尾砂充填。胶结充填采矿法安全性好、回采率高,为矿山技术进步、提高经济效益起到了积极作用。 According to occurrence condition of ore body of Houzhuang ore deposit at - 160m level above and the surface do not allow caves in, first step of room, second step of room upwards lamination stoping-cemented fill method is brought up. The first step of room cemented fills with cementitious material and tails, second step of room fills with tails. The security of the stoping-cemented fill method is good and the rate of extraction is high. It has made the contribution for mine in technical progress and improving economic benefits.
出处 《山东冶金》 CAS 2006年第3期37-39,共3页 Shandong Metallurgy
关键词 采矿方法 胶结充填 尾砂 回采 mining method cemented filling tailing stoping
  • 相关文献

参考文献3

  • 1张春方,等.山东金岭铁矿侯庄矿区-160m水平以上矿体回采初步设计[R].淄博:化学工业部连云港设计研究院齐鲁分院,2004.
  • 2谢世俊,等.采矿手册[M].北京:冶金工业出版社,1990.
  • 3王剑波,等.金岭铁矿侯庄矿区-160m以上矿体开采方法、结构参数及安全控制研究[R].青岛:青岛理工大学矿业工程研究所,2004.

同被引文献52

引证文献10

二级引证文献65

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部