期刊文献+

规制承诺不确定条件下的电网投资效应及其政策设计 被引量:7

Transmission Investment under Regulation Uncertainty and Policy Design
原文传递
导出
摘要 本文研究规制政策不确定条件下电网投资效应问题。通过对投资回报率规制政策下规制机构与电网企业的完全信息博弈模型分析,得出了电网企业和规制机构分别限制投资和改变规制政策或承诺的最优均衡解,从而得出了规制承诺或政策不确定条件下存在投资不足效应的结论。为了促进电网投资均衡,实现社会福利最大化,规制机构应该用效用函数重新定义投资均衡,将供求均衡状况因素引入投资回报率规制政策中,制定和执行弹性而可信的规制政策。 In this paper, we established a transmission investment model under regulation uncertainty. Through analysis the investment strategy game model between regulator and investor, we get a conclusion that the investor will limit grid investment. In order to promote transmission investment, regulator should change the policy tools, introduce the supply and demand factor, make the utility function into the balance definition,and constitute elastic and believable policy.
出处 《中国工业经济》 CSSCI 北大核心 2006年第7期73-79,共7页 China Industrial Economics
基金 国家自然科学基金项目"电力市场条件下电力工业投资均衡机制及相关政策研究"(批准号70473008)
关键词 投资不足 规制承诺 不确定性 政策设计 underinvestment regulation commitment uncertainty policy design
  • 相关文献

参考文献12

  • 1夏清,彭涛,周安石,江健健,康重庆.保证电力供需长期均衡的措施研究[J].电力系统自动化,2004,28(6):1-5. 被引量:92
  • 2Averch H., Johnson L. Behavior of the Finn under Regulatory Constraint[J]. American Economic Review, 1962,52(4).
  • 3Brunekreeft G.,Neuhoff K. David Newbery. Electricity Transmission: An Overview of the Current Debate[J]. Utilities Policy, 2005,13(2).
  • 4Sun H., Sanford M., Powell L. Justifying Transmission Investment in the Markets [J]. Electricity Transmission in Deregulation Markets, 2004, 12(7).
  • 5Brennan T. Alleged Transmission Undersupply: Is Restructuring the Cure or the Cause [R]. Discussion paper, 2005, http ://www.rff.org/Documents/RFF-DP-05-50
  • 6Peterson H. C. An Empirical Test of Regulatory Effects[J]. Bell Journal of Economics, 1975, 6(1).
  • 7Davis E. G. A Dynamic Behavior of a Regulated Finn with a Price Adjustment Rule [J]. Bell Journal of Economics & Management Science, 1973, 4(1).
  • 8Baumol E. J., Klevorick K. Input Choices and Rate of Return Regulation: An Overview of the Discussion [J]. Bell Journal of Economics & Management Science, 1970,1 (2).
  • 9Martzoukos S. H., Teplitz-Sembitzky W. Optimal Timing of Transmission Line Investments in the Face of Uncertain Demand: An Option Valuation Approach [J]. Energy Economics, 1992, 14(1).
  • 10Saphores J., Gravel E., Bernard T. Regulation and Investment under Uncertainty: An Application to Power Grid Interconnection [J]. Journal of Regulatory Economics, 2004, 25(2).

二级参考文献5

共引文献103

同被引文献59

引证文献7

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部