期刊文献+

连拱隧道中隔墙设计与施工力学行为研究 被引量:48

STUDY ON MECHANICAL BEHAVIOURS OF DESIGNING AND CONSTRUCTION FOR CENTER PILLAR OF DOUBLE-ARCHED TUNNEL
下载PDF
导出
摘要 在连拱隧道施工中,中隔墙扮演着至关重要的角色。中隔墙上方作用荷载大小,不仅关系着连拱隧道在施工期间结构的安全,还直接影响工程造价以及隧道建成后衬砌结构的长期安全性。结合连拱隧道施工期间中隔墙的实际受力过程,建立中隔墙作用荷载的计算力学模型;采用FLAC程序,在0.5~2.0D埋深条件下,采用三导洞法和中导洞法对连拱隧道施工力学过程的II~IV类围岩的21种工况进行非线性数值模拟。同时,提出应用于中隔墙设计的作用荷载计算表达式及各类围岩相适应的施工工法。研究结果直接指导金丽温高速公路二期工程多座连拱隧道的变更设计,对今后国内连拱隧道中隔墙的设计施工有一定的参考价值。 During the construction of double-arched tunnel, the role of center pillar is of great importance. As a key load-bearing component in double-arched tunnel support, it will influence the stability and construction cost as well as long-term safety of double-arched tunnel. Therefore, the assumption of loads acting on center pillar is of an important consideration in structure design. Through the analysis of the loads acting on center pillar during double-arched tunnel construction procedure, the mechanical model for calculation of practical loads acting on center pillar is set up. By using FLAC, twenty-one kinds of cases for double-arched tunnel in surrounding rock masses with Classes II - IV are studied. The covering depths from 0.5D to 2.0D as well as the three construction methods consisting of three-drift and center-drift coupled with bench cut and full-face methods are considered. Based on analysis of the loaded characteristics of center pillar and magnitude changes of actual loads, the two estimation formulae of loads acting on the center pillar in place of the assumption of the total overburden load for design of center pillar structure are proposed. Furthermore, the optimum construction methods corresponding to the different classes of rock masses are recommended. The achieved results are successfully applied to the modification design of double-arched tunnels of Jinhua--Lishui--Wenzhou Expressway in East China. The results demonstrate that the assumption of proposed loads acting on center pillar is reasonable, and the optimum construction methods can save construction cost and shorten construction period of double-arched tunnel.
作者 张志强 何川
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2006年第8期1632-1638,共7页 Chinese Journal of Rock Mechanics and Engineering
关键词 隧道工程 连拱隧道 中隔墙 设计荷载 施工工法选择 tunnelling engineering double-arched tunnel center pillar design loads selection of construction methods
  • 相关文献

参考文献11

二级参考文献17

  • 1夏才初,刘金磊.相思岭连拱隧道中墙应力研究[J].岩石力学与工程学报,2000,19(z1):1115-1119. 被引量:66
  • 2邹志晖,汪志林.锚杆在不同岩体中的工作机理[J].岩土工程学报,1993,15(6):71-79. 被引量:77
  • 3FAIRHUST C.岩土工程中锚固的数值研究.中国广州锚固与灌浆技术国际学术讨论会特约报告[M].广州:华南理工大学出版社,1994..
  • 4朱维申 张玉军.锚杆加固围岩的效应及其在船闸高边坡中的应用.国际岩土锚固与灌浆新进展[M].北京:中国建筑工业出版社,1996.209-216.
  • 5王毅才.隧道工程[M].北京:人民交通出版社,2000..
  • 6Lo J,Support design of rock tunnels,1999年,259页
  • 7Fairhust C,中国广州锚固与灌浆技术国际学术讨论会特约报告,1994年
  • 8孙钧 汪炳鉴.地下结构有限元分析[M].上海:同济大学出版社,1998..
  • 9.公路隧道设计规范[M].北京:人民交通出版社,1995..
  • 10CS德赛 JT克里斯琴.岩土工程数值方法[M].北京:中国建筑工业出版社,1981..

共引文献314

同被引文献285

引证文献48

二级引证文献325

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部