金凤公司1号矿体试验采场稳定性及地压控制的实践 被引量:6

The stability of a testing stope of No.1 orebody in Jinfeng and the practice of ground pressure control
下载PDF
导出
摘要 采场地压控制是空场采矿法开采工艺的关键环节。通过对金凤公司工程地质调查和岩体稳定性综合评价,提出合理的地压控制措施,优化采场结构参数和采场支护方法,并通过回采期间地压监测,确保了采场安全。 Stope ground pressure control is a key issue in an open stope mining process. By geological investigation and comprehensive evaluation of rock stability of the engineering in Jinfeng, sensible measures to control ground pressure,parameters to optimize stope structure and support methods were put forward ,which ensure the stope' s safe operation via pressure monitoring during stoping.
机构地区 长春黄金研究院
出处 《黄金》 CAS 北大核心 2006年第8期17-22,共6页 Gold
关键词 空场采矿法 采场稳定性 地压监测 地压控制 open stope mining method stope stability ground pressure monitoring ground pressure control
  • 相关文献

参考文献4

  • 1E Hock,J W Bray.岩石地下工程[M].北京:冶金工业出版社,1986.
  • 2Bieniwski Z T. Geomechanics classification of rock mass and its applications in tunneling [ Z ]. Proc. 3rd Int. Cong. On Rock Mech, ISRM, Denver, 1974.
  • 3Barton N, Lien R, Lunde J. Engineering classification of rock masses for the design of tunnel support [ J ]. Rock Mechanics, 1974,6 ( 4 ) :189 - 238.
  • 4Brady B H,Brown E T.地下采矿岩石力学[M].北京:煤炭工业出版社,1990.

同被引文献48

引证文献6

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部