期刊文献+

炼钢-连铸智能调度软件的开发及应用 被引量:22

Intelligent scheduling software & its application in steelmaking and continuous casting
下载PDF
导出
摘要 针对大型钢铁企业炼钢-连铸生产调度过程难以控制的问题,将智能优化设定控制策略应用于炼钢-连铸生产调度过程中,将优化调度方法、专家系统、案例推理等技术相结合,研发了集调度计划编制、在线跟踪与调整、人机交互等功能为一体的调度软件。讨论了调度策略、软件的结构和功能,并将所研发的调度软件应用到某大型钢铁联合企业炼钢-连铸生产过程中,取得了显著的成效。工业实验表明,该调度软件具有良好的性能和在工业界广泛应用的前景。 As it is difficult for large-scale iron and steel corporations to control the scheduling process in steelmaking and continuous casting production, a kind of scheduling software was developed to solve this problem based on the combinations of intelligent optimization method, expert system and case-based reasoning technology. The software had multiple functions, such as scheduling plan making, dynamic tracking and adjusting, and man-machine interaction, etc. The scheduling strategies, the structure and the function of the software were discussed in detail. The software has been applied successfully to a large- scale iron and steel corporation in China, and applying results have shown that this software has excellent capabilities and a promising application future in industries.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2006年第8期1220-1226,1234,共8页 Computer Integrated Manufacturing Systems
基金 国家863/CIMS主题资助项目(2004AA412010) 国家自然科学基金重点资助项目(60534010) 国家创新研究群体科学基金资助项目(60521003) 长江学者和创新团队发展计划资助项目(IRT0421)~~
关键词 炼钢-连铸 生产调度 调度软件 智能优化方法 steelmaking and continuous casting production scheduling scheduling software intelligent optimization method
  • 相关文献

参考文献10

  • 1TANG L X,LIU J Y,RONG A Y,et al.A mathematical programming model for scheduling steelmaking-continuous casting production[J].European Journal of Operational Research,2000,120(2):423-435.
  • 2HARJUNKOSKI I,GROSSMANN I E.A decomposition approach for the scheduling of a steel plant production[J].Computers and Chemical Engineering,2001,25 (11-12):1647 -1660.
  • 3FOX M S,SMITH S F.ISIS-a knowledge-base system for factory scheduling[J].Expert Systems,1984,1(1):25-48.
  • 4DORN J,SHAMS R.Scheduling high-grade steelmaking[J].IEEE Expert,1996,11(1):28-35.
  • 5MOHANTY P P.An Agent-oriented approach to resolve the production planning complexities for a modern steel manufacturing system[J].International Journal Advance Manufacturing Technology,2004,24(3-4):199-205.
  • 6COWLING P I,OUELHADI D,PETROVIC S.A multi-Agent architecture for dynamic scheduling of steel hot rolling[J].Journal of Intelligent Manufacturing,2003,14(5):457-470.
  • 7OUELHADJ D,PETROVIC S,COWLING P I,et al.InterAgent cooperation and communication for Agent-based robust dynamic scheduling in steel production[J].Advanced Engineering Informatics,2004,18(3):161-172.
  • 8COWLING P I,JOHANSSON M.Using real time information for effective dynamic scheduling[J].European Journal of Operational Research,2002,139(2):230-244.
  • 9LU C Y,STANKOVIC J,TAO G,et al.Feedback control real -time scheduling:framework,modeling,and algorithms[J].Real-Time Systems Journal(Special Issue on Control-Theoretical Approaches to Real-Time Computing),2002,23 (1 -2):85-126.
  • 10CHAI T Y,GUAN S P.Object-oriented integrated control technology of complex industrial processes[A].Proceedings of IFAC 5 Symposium on Low Cost Automation[C].Shenyang,China:Automation Research Institute of Ministry of Metallurgical Industry(ARIM),1998.1-11.

同被引文献355

引证文献22

二级引证文献179

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部