期刊文献+

综合考虑可靠性成本与缺电成本的电网规划 被引量:16

Power network planning considering reliability cost and unerved energy cost
下载PDF
导出
摘要 在配电网规划中要提高配电网的供电可靠性,减少用户侧的缺电成本,必然要求供电部门增加可靠性投资成本,然而盲目地追求供电可靠性,必然导致供电部门可靠性投资成本急剧增加。为了寻求供电可靠性与可靠性成本的平衡点,综合考虑了可靠性成本和缺电成本,提出了可靠性成本效益回归模型,利用此模型在众多配电网规划方案中确定最佳可靠性方案。通过实例分析计算并讨论,建立的模型及方法能方便有效地确定配电网规划中最佳可靠性方案。 It is necessary for power supply company to increase reliability investment cost in order to improve power supply reliability of distributed network and decrease consumer unserved energy cost on distribution network planning, however, if the power company blindly pursuit power supply reliability, it certainly results in sharp increase of reliability investment cost. In order to pursuit the balance between power supply reliability and reliability cost, this paper considers reliability cost and unserved energy cost, and introduces reliability cost-benefit regressive model with which the company can decides optimum reliability scheme in numerous power distribution network planning schemes. It is convenient and efficient that the model and method can decide best reliability scheme on power distribution network planning with the example.
机构地区 上海电力学院
出处 《继电器》 CSCD 北大核心 2006年第17期38-41,46,共5页 Relay
基金 上海市重点学科建设资助项目(P1301)
关键词 可靠性成本 缺电成本 电网规划 成本效益 最佳可靠性 reliability cost unserved energy cost power network planning cost-benefit optimum reliability
  • 相关文献

参考文献3

二级参考文献4

  • 1张焰.不确定性的长期电网规划方法研究:博士学位论文[M].上海:上海交通大学,1998..
  • 2于尔铿,电力市场讲义,1995年
  • 3张焰,博士学位论文,1998年
  • 4杨莳百,电力系统可靠性分析基础及应用,1986年

共引文献91

同被引文献158

引证文献16

二级引证文献99

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部