基于Agent的网络化制造资源优化配置方法研究 被引量:1

Research on Networked Manufacturing Resources Optimization Deployment Model Based on Agent
下载PDF
导出
摘要 针对网络化异地协同制造模式下的制造资源优化配置问题,提出了一种双层次的制造资源优化配置方法,并利用Agent技术和合同网技术建立了双层次制造资源优化配置的实现框架。提出对制造任务用两个层次即LMP(由有序的LMU组成)和LMU(由工序作业组成)来描述。在第一层次,面向LMP中的LMU利用招投标技术实现PMU配置,针对LMP产生一条EMP;在第二个层次面向LMU中的工序作业利用招投标技术实现设备资源的配置,针对LMU产生由设备序列组成的加工路线。最后给出了一个实例说明该方法和实现框架的可行性和有效性。 To solve resources optimizing deployment question for networked cooperative manufacturing,a double layer manufacturing resources optimizing deployment model is studied,and the realization framework for the double layer manufacturing resources optimizing deployment is established based on the Agent technology and the contract network technology.In this model,the manufacturing task is described by LMP(LOgical Manufacturing Process,composed of several orderly LMU) and LMU (Logical Manufacturing Unit,composed of several working procedures ).In the first layer,the bid ding-tendering technology is taken to realize the deployment of PMU(Physical Manufacturing Unit) for the LMU in LMP,and an executive manufacturing process(EMP) is produced for the LMP;in the second layer,the bidding-tendering technology is taken to realize the deployment of machining tools in a PMU for the working procedures in LMU ,and a list of machining tools are produced for the LMU.At last,an example is given to prove the feasibility and validity of the model and the realization framework.
出处 《计算机工程与应用》 CSCD 北大核心 2006年第26期211-214,232,共5页 Computer Engineering and Applications
基金 国家863高技术研究发展计划资助项目(编号:2003AA414320 2003AA414014) 国防科工委柔性制造系统技术国防科技重点实验室基金资助项目(编号:51458070204HK0328)
关键词 资源优化配置 合同网 多代理技术 manufacturing resources optimization deployment,contract net,multi-agent technology
  • 相关文献

参考文献6

二级参考文献37

  • 1[1]Laurak Church,Reha Uzsoy. Analysis of periodic and event-driven rescheduling policies in dynamic shops. International Journal of Computer Integrated Manufacturing, 1992,5(3):153~163
  • 2[2]Sun D,Lin L. A dynamic job shop scheduling framework: a backward approach. International Journal of Production Research,1994,32(4):967~985
  • 3[3]Jian Fang,Yugeng Xi. A rolling horizon jop shop rescheduling strategy in the dynamic environment. Advanced Manufacturing Technology,1997,13:227~232
  • 4[4]Monostori L,Kadar B,Hornyak J. Approaches to managing changes and uncertainties in manufacturing. Annals of the CIRP,1998,47(1):365~368
  • 5[5]Treleven M D,Elvers D A. An investigation of labor assignment rules in a dual resource constrained fob-shop. The Journal of Operation management,1985,6(1):51~68
  • 6[6]Treleven M D. A review of the dual-resource constrained system research. IIE Transactions,1989,21:279~287
  • 7[7]Miller J G,Berry W L. Heuristic methods for assignment men to machines: an experiment analysis. AIIE Transactions,1974,6:97~104
  • 8[8]Hon K K B,Chi H. A new approach of group technology parts families optimization. Annals of the CIRP,1994,43(1):425~428
  • 9[9]Wiendahl H P,Garlichs R. Decentral production scheduling of assembly systems with genetic algorithm. Annals of the CIRP,1994,48(1):389~392
  • 10[10]Wong N,Leu M C. Adaptive genetic algorithm for optimal printed circuit board assembly planning. Annals of the CIRP,1993,42(1):17~20

共引文献178

同被引文献15

引证文献1

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部