摘要
文章介绍芜湖下闸排涝2站深井降水的设计和施工工序,并给出试验结果。
This article introduces the design and construction procedure of precipitation well at Wuhu xiazha No. 2 drainage station and gives test results.
出处
《安徽水利水电职业技术学院学报》
2006年第3期45-47,共3页
Journal of Anhui Technical College of Water Resources and Hydroelectric Power
关键词
降水井
设计
施工
precipitation well
design, construction