期刊文献+

需求和生产成本同时发生扰动时的供应链协调 被引量:56

Supply Chain Coordination with Demand and Production Cost Disruptions
原文传递
导出
摘要 分析了在一个供应商和一个零售商组成的供应链中,当市场需求为市场价格的线性函数,市场需求和生产成本同时发生扰动时,供应商的扰动管理决策,探讨了在供应商为Stackelberg博弈主导者情形下的供应链协调机制. This paper represents coordination policies for a one-supplier-one-retailer supply chain that experiences demand and production cost disruptions in the planning horizon. We analyze the disruption management decisions from the point view of the supplier when demand and production cost disrupt simultaneously. We provide the coordination policies when the supplier and retailer take part in a Stackelberg game and supplier is the leader.
出处 《系统工程理论与实践》 EI CSCD 北大核心 2006年第9期51-59,共9页 Systems Engineering-Theory & Practice
基金 国家自然科学基金(70471034A0324666)
关键词 供应链管理 扰动管理 需求扰动 生产成本扰动 供应链协调 supply chain management disruption management demand disruption production cost disruption supply chain coordination
  • 相关文献

参考文献2

二级参考文献19

  • 1[1]Boyaci, T. and Gallego, "Coordinating pricing and inventory replenishment policies for one wholesaler and one or more geographically dispersed retailers",International Journal of Production Economics, Vol. 77, pp95-111, 2002.
  • 2[2]Chen. F., A. Federgruen and Y.-S. Zheng,"Coordination mechanisms for a distribution system with one supplier and multiple retailers", Management Science, Vol. 47, No.5, pp693-708, 2002.
  • 3[3]Cliausen, J., J. Hansen, J. Lansen and A.Larsen, "sruption management", ORMS Today, Vol. 28, No 5, pp40-43, 2001.
  • 4[4]Jeuland, A. and S. Shugan, "Managing channel profits", Marketing Science, Vol. 2,pp239-272, 1983.
  • 5[5]Milner, J.M. and M.J. Rosenblatt, "Flexible supply contracts for short life-cycle goods:The buyers's perspective", Naval Research Logistics, Vol. 49, No. 1, pp25-45, 2002.
  • 6[6]QI, X., J.F. Bard and G. YU, Supply chain coordination with demand disruptions,Working paper, Department of Management Science and Information Systems,McCombs School of Business, The University of Texas, Austin, TX. 78712,2002(a).
  • 7[7]QI, X., J.F. Bard and G. YU, Disruption management for machine scheduling: the case of SPT schedules, Working paper,Department of Management Science and Information Systems, McCombs School of Business, The University of Texas, Austin,TX. 78712, 2002(b).
  • 8[8]Thengvall, B., J.F. Bard and G. YU,"Balancing user preferences for aircraft schedule recovery during irregular operations", IIE Transactions on Operations Engineering, Vol. 32, No. 3, pp181-193,2000.
  • 9[9]Weng, K, "Channel coordination and quantity discounts", Management Science,Vol. 41, No. 9, pp1509-1522, 1995.
  • 10[10]Yang, J., X. QI and G. YU, Disruption management in production planning,Working paper, Department of Management Science and Information Systems,McCombs School of Business, The University of Texas, Austin, TX. 78712,2001.

共引文献103

同被引文献415

引证文献56

二级引证文献299

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部