随机需求环境下的作业能力规划模型研究 被引量:4

Capacity planning based on stochastic demand
下载PDF
导出
摘要 为研究市场需求的随机性对企业能力扩张决策的影响,根据确定性能力规划模型的一般形式,构建了随机市场需求环境下的能力规划模型。该模型以随机环境下期望成本最小为目标函数,引入随机需求变量,建立了市场需求的随机约束。基于随机线性约束的二阶段方法,得到了随机能力规划问题的确定性等价形式,提出了一种将遗传算法和随机线性规划二阶段模型相结合的随机能力规划模型求解算法。该算法在事先得到能力规划变量的情况下,使用二阶段方法求解随机需求约束下的产品组合问题,并以产品组合问题的最优解作为适应度函数,通过遗传操作,搜索能力规划的整数变量,获得随机能力规划问题的最优解。 To study the stochastic factors affecting capability extension decisions of enterprises, based on the general form of certainty capability planning model, a stochastic capability planning model was constructed. In this model, to minimize expected cost was taken as objective function in stochastic conditions. The stochastic marketing constraint was built through introducing random requirement variables. And then, based on two-phase model of stochastic linear constraint, the certainty equation of stochastic capability planning model was obtained. An algorithm that integrated Genetic Algorithm (GA) with two - phase model of stochastic linear constraint was proposed. Knowing capability decision variables beforehand, the two-phase model of stochastic linear constraint was used to deal with combinatorial product problems. The solution to combinatorial product was used as fitness function for GA. Through GA operation, the capacity decision integral variables were searched until the optimum solution emerged.
作者 张人千
出处 《计算机集成制造系统》 EI CSCD 北大核心 2006年第9期1359-1366,共8页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(70501002) 航空支撑科技基金资助项目(03E51008)~~
关键词 能力规划 遗传算法 随机线性规划 二阶段模型 capacity planning genetic algorithm stochastic linear programming two-phase model
  • 相关文献

参考文献10

  • 1CHAND S, MCCLURG T, WARD J. A model for parallel machine replacement with capacity expansion[J]. European Journal of Operational Research, 2000,121(3): 519-531.
  • 2LEE L H, TAN K C, OU K, et al. Vehicle capacity planning system: a case study on vehicle routing problem with time windows[J]. IEEE Transactions on Systems, Man, and Cybernetics-Part A Systems and Humans, 2003, 33(2): 169-178.
  • 3张人千,魏法杰.作业能力扩张模型与求解算法研究[J].计算机集成制造系统-CIMS,2004,10(4):374-380. 被引量:11
  • 4GRUBBSTROM R W, WANG Z. A stochastic model of multi-level/multi - stage capacity - constrained production - inventory systems[J]. International Journal of Production Economics, 2003,81-82(1): 483-494.
  • 5HOOD S J, BERMON S, BARAHONA F. Capacity planning under demand uncertainty for semiconductor manufacturing[J]. IEEE Transactions on Semiconductor Manufacturing, 2003,16 (2) : 273-280.
  • 6张人千,魏法杰.基于作业成本的产品组合决策随机模型与求解[J].系统工程理论与实践,2003,23(12):63-69. 被引量:6
  • 7IIDA T. A non-stationary periodic review production-inventory model with uncertain production capacity and uncertain demand[J]. European Journal of Operational Research, 2002, 140(3): 670-683.
  • 8WANG Reaychen, LIANG Tienfu. Application of fuzzy multi-objective linear programming to aggregate production planning[J]. Computers : Industrial Engineering, 2004, 46 (1): 17-41.
  • 9KARL P. Stochastic linear programming[M]. Shanghai, China: Shanghai Technology and Science Press, 1988. 34-52.
  • 10BYRNE M, AKIF BAKIR B. Stochastic linear optimisation of an MPMP production planning model [J]. International Journal of Production Economics, 1998,55(1) : 87-96.

二级参考文献9

  • 1张人千,魏法杰.动态随机作业成本控制系统框架研究[J].中国管理科学,2000,8(S1):76-81. 被引量:6
  • 2谭甄.[D].北京: 北京航空航天大学经济管理学院,2000,11:11-12,44-50.
  • 3P卡尔 王金德译 唐述钊校.随机线性规划[M].上海:上海科学技术出版社,1988..
  • 4CHAND S,MCCLURG T,WARD J. A model for paralell machine replacement with capacity expansion[J]. European Journal of Operational Research, 2000,121:519-531.
  • 5OLHAGER J, RUDBERG M, WIKNER J. Long-term capacity management: link the perspective from manufacturing strategy and sales and operations planning[J]. International Journal of Production Economics, 2001,69:215-225.
  • 6SHAPIRO J F. On the connections among activity-based costing, mathematical programming models for analyzing strategic decisions, and the resource-based view of the firm[J]. European Journal of Operational Research, 1999,118:295-314.
  • 7LACKSONEN T.Empirical comparison of search algorithms for discrete event simulation[J]. Computers & Industrial Engineering, 2001,40:133-148.
  • 8徐学军,顾培亮.随机综合生产计划模型及其求解研究[J].工业工程,2001,4(3):12-15. 被引量:8
  • 9张人千,魏法杰,谭甄.基于成本的车间作业优化模型及实证研究[J].中国管理科学,2002,10(5):74-77. 被引量:11

共引文献13

同被引文献42

  • 1李葆文.设备前期管理(四) 第二讲 设备的规划、投资效益分析与选型(续二)[J].设备管理与维修,2004(7):42-44. 被引量:3
  • 2沈斌,陈伟.启发式仿真优化方法及其在独立制造岛规划设计中的应用[J].机械工程学报,2005,41(7):71-79. 被引量:5
  • 3侯亮,韩东辉,林祖胜.大规模定制模式下的产品外协资源配置研究[J].机械工程学报,2006,42(5):131-136. 被引量:14
  • 4Chand S, McClurg T, Ward J. A model for parallel machine replacement with capacity expansion[J]. European Journal of Operational Research, 2000, 121(3): 519-531.
  • 5Rajagopolan S. Capacity expansion and equipment replacement: A unified approach[J]. Operations Research, 1998, 46(6): 846-857.
  • 6Balakrishnan J, Cheng C H. Multi-period planning and uncertainty issues in cellular manufacturing: A review and future directions[J]. European Journal of Operational Research, 2007, 177(1): 281-309.
  • 7Shapiro J F. On the connections among activity-based costing, mathematical programming models for analyzing strategic decisions, and the resource-based view of the firm[J]. European Journal of Operational Research, 1999, 118(2): 295--314.
  • 8Eppen G D, Martin R K. A scenario approach to capacity planning[J]. Operations Research, 1989, 37(4): 517-527.
  • 9Swaminathan J M. Tool capacity planning for semiconductor fabrication facilities under demand uncertainty[J]. European Journal of Operational Research, 2000, 120(3): 545-558.
  • 10Chen Z L, Li S L, Tirupati D. A scenario-based stochastic programming approach for technology and capacity planning[J]. Computers &: Operations Research, 2002, 29(7): 781-806.

引证文献4

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部