摘要 为解决风积沙作为公路路基填料难以压实的问题,通过重型击实和振动压实对比试验及理论计算,分析了风积沙的压实机理。结果表明:风积沙无粘性是导致其压实曲线呈双峰值的原因,也是其颗粒在压实时有着特殊运动规律的原因。风积沙颗粒间能否重新排列及压实功是影响压实效果的主要因素,振动加速度对这两个因素均有较大影响,而重型击实只对压实功有影响,因此风积沙的压实应采用振动法,且风积沙振动干压实在工程上是可行的。 By means of contrast experiment that contrasted weighty tamping and vibrauon compaction, the compaction mechanism of the aeolian sand was analyzed to solve the problem that aeolian sand was difficult to impact when it was used as roadbed material. As a result,the reason of having two peak value in the aeolian sand tamping curve is that aeolian sand is not a sticky material; it is also the reason that the aeolian sand granule has special movement rule while impacting. The main factors affecting compaction effect are realigning of granule and the power of compaction. Vibration acceleration can influence the two factors largely ,but weighty tamping can only influence the power of compaction, so the way to impact aeolian sand is vibration compaction, and aeolian sand vibration compaction in dry condition is feasible in engineering.
出处 《中国公路学报》 EI CAS CSCD 北大核心 2006年第5期6-11,共6页 China Journal of Highway and Transport
基金 国家西部交通建设科技项目(200131879308)
关键词 道路工程 风积沙 试验研究 压实机理 振动压实 重型击实 road engineering aeolian sand experimental research compaction mechanism vi-bration compaction weighty tamping
  • 相关文献

参考文献7

二级参考文献16

  • 1唐勇,李志农,宁江波.沙漠公路路基的机械化施工工艺研究[J].筑路机械与施工机械化,1993,10(3):27-29. 被引量:2
  • 2陈忠达.沙漠公路施工质量控制与评价标准研究报告[M].,1993..
  • 3新疆交通科研所 西安公路交通大学.新疆沙漠公路修筑技术研究报告[M].,1993..
  • 4鄂俊太 等.压路机选型与压实技术[M].北京:人民交通出版社,1991..
  • 5沙庆林.公路压实与压实标准(第三版)[M].北京:人民交通出版社,1995..
  • 6张克昌.无粘性土压实与含水量的试验及分析[J].水利水电技术,1986,28(8):35-38.
  • 7侯永峰.循环荷载作用下复合土与复合地基性状研究[M].杭州:浙江大学,2000..
  • 8窦明健,华东公路,1995年,1期,21页
  • 9陈忠达,沙漠公路施工质量控制与评价标准研究报告,1993年
  • 10新疆交通科研所,新疆沙漠公路修筑技术研究报告,1993年

共引文献178

同被引文献256

引证文献45

二级引证文献242

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部