沈阳建设节约型地铁的投资对策与控制

Investment Countermeasures and Control on Constructing an Economical Metro in Shenyang
下载PDF
导出
摘要 研究目的:针对沈阳为建设成一个质量好、投资省的节约型地铁的目标,在项目决策阶段所采取的节省投资对策和在项目实施阶段所采取的投资控制措施进行了深入分析和讨论,并得出有益结论,目的在于为我国降低地铁造价提供借鉴作用。研究方法:文中采用对比、分析和论证的方法,将沈阳与其它城市已建成的地铁项目在投资决策和控制方面进行了比较、分析和论证。研究结果:根据我国目前的经济水平,节约型地铁的单位公里造价应控制在4.5亿元以内较为经济适用。研究结论:充分做好项目前期研究策划工作,加强土地规划控制,地铁设备立足国产化,采用限额设计,加强地铁建设项目全过程管理等是建设节约型地铁有效措施。 Research purposes: Aimed at building an economical metro with good quality in Shenyang, the pape deeply analyzed and discussed the saving investment countermeasures at decision - making stage and the investment contol measures at implementation stage. And the paper drew useful conclusions in order to be references for debasing the metro cost in our country. Research methods:By comparing the metro projects in Shenyang with the built metro projects in other cities, the paper compared, analyzed and demonstrated the investment decision-making and control. Research results:According to the economical level in our country nowadays, it was economical and suitable that the unit cost per kilometer of the economical metro should be controlled under 450 million RMB. Research conclusions:It should be effective measures to fully prepare the studying and planning work, enhance the program and control of land, adopt domestic equipments, design within quota, enhance the whole process management of the metro projects.
机构地区 东北大学
出处 《铁道工程学报》 EI 北大核心 2006年第6期78-81,共4页 Journal of Railway Engineering Society
关键词 沈阳 节约型地铁 造价 控制 shenyang economical metro cost control
  • 相关文献

参考文献5

二级参考文献10

共引文献61

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部