摘要
基于物理模型试验,研究分析了景洪水电站不同泄流方式对升船机下引航道口门区的通航水流条件的影响,针对原设计所存在的问题,提出了下引航道外引墙采取透空布置的优化工程措施,较好地改善了引航道口门区的通航水流条件。
Based on the model test of Jinghong power station on the Lancang river, the unfavorable navigation condition at entrance area of down approach channel of the ship lift is measured and analyzed for original design scheme of the project, and the open -type guide works is applied to greatly improve the bad flow condition, so as to make the navigation condition better at entrance area.
出处
《重庆建筑大学学报》
EI
CSCD
北大核心
2006年第5期55-58,62,共5页
Journal of Chongqing Jianzhu University
关键词
水电站枢纽
下引航道口门区
通航条件
透空式导航墙
hydro power station junction
entrance area at approach channel
navigation condition
open - type guide wall