随着电力系统的改革和国外融资进入电力行业,工程项目后评价工作已全面提出。国资委为此印发了《中央企业固定资产投资项目后评价工作指南》。各电力项目投资单位均要求按《工作指南》对重点项目进行后评价。后评价涉及总体和单项工程后评价,成果应用和指标体系。对比法较适用于电力系统。
With reform of electric power system and foreign financing entering into power industry in China the post - evaluation for an engi- neering project has been put forward. The State Assets Committee has issued the "Work Guidance for post -evaluation of fixed assets investment projects of central enterprises". All organs for investment on power projects should carry out the post - evaluation of key projects according to the "Work Guidance". The post - evaluation is dealt with the post - evaluation for a general and individual project, application of results and index system. The comparison method is suitable for the power system.
出处
《电力建设》
2006年第10期67-68,77,共3页
Electric Power Construction
关键词
电力建设
项目
评价
工作指南
electric power construction
project
evaluation