摘要
综合考虑预防性维修最小费用准则和最大可用度准则,利用多目标规划法优化模型,并利用实例进行验证,证实了这种方法的可行性。
Taking account the principles of maximum availability and minimal maintenance fee comprehensively, the optimization model for the preventive maintenance of warship is set up by the method of multiple objects decision-making, The numerical example of a real warship proves that the method proposed is feasible.
出处
《船海工程》
北大核心
2006年第5期99-101,共3页
Ship & Ocean Engineering
关键词
预防性维修
最大可用度
最小费用
多目标规划
preventive maintenance maximum availability minimal fee multiple objects decision-making