船舶制造全过程目标成本动态控制体系研究 被引量:4

Framework of whole process target cost dynamic control for shipbuilding
下载PDF
导出
摘要 分析船舶制造的特征和船舶制造目标成本控制的现状,以单条船舶为基本研究对象,以产品形成的全过程为主线,运用控制点的思想,建立船舶制造全过程目标成本动态控制体系,该系统包括经营报价、成本分解、设计成本、采购成本、制造成本、专项费用和完工分析七大控制点,最后简要介绍了该体系的计算机支持系统。 After analyzing the characteristics and cost control actuality of shipbuilding, this paper puts forward the framework of the whole process cost dynamic control for shipbuilding, it can achieve integrated control between cost and clue time. The framework includes seven control nodes as following: quoted price, cost disassembling, designing cost, purchasing cost, manufacturing cost, special fee and project-after cost analyzing. The Target Cost Control System for Shipbuilding (TCCS-Shipbuilding) is introduced briefly which supports the framework.
出处 《船海工程》 北大核心 2006年第5期111-114,共4页 Ship & Ocean Engineering
关键词 船舶制造 目标成本 成本控制 shipbuilding target test test control
  • 相关文献

参考文献5

二级参考文献7

  • 1徐正旦 石人瑾 等.成本会计[M].上海:上海三联书店,1994..
  • 2[美]查尔斯·亨格伦 格里·桑顿 等.管理会议教程[M].北京:华夏出版社,1999..
  • 3国务院发展研究中心课题组.调整、改革与竞争力的提升[N].中国经济时报,2002-3-20.
  • 4中船重工政研室.中国船舶重工集团公司发展战略研究[R].中国船舶重工集团公司,2001..
  • 5青连斌.领导干部眼中的中国未来十年[N].学习时报,2002-6-24.
  • 6W.Mаβberg,王继平.生产中复杂性的控制[J].工业工程与管理,1999,4(2):8-14. 被引量:1
  • 7南京大学会计学系课题组,杨雄胜,陈丽花,苏文兵,缪艳娟,杨惠敏,韩永斌,李翔,曾颖,刘颖,刘佳,王南.中国企业预算管理现状的判断及其评价[J].会计研究,2001(4):15-29. 被引量:168

共引文献29

同被引文献17

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部