期刊文献+

客运专线综合接地系统方案研究 被引量:15

Program Research on Integrated Grounding System for Passenger Dedicated Railway Line
下载PDF
导出
摘要 研究目的:本文提出了综合接地系统的总体要求、范围、贯通地线的规格等,为满足目前客运专线站前基础工程的施工需要具有深刻的现实意义。研究方法:客运专线综合接地系统是一项复杂的系统工程,本文通过对综合接地系统的必要性和可行性分析及方案研究,达到将各种接地有机、合理的结合起来,保证客运专线各系统、各设备之间实现等电位连接,减少不同设备、不同系统之间存在的电位差及可能造成的人身和设备的安全隐患。研究结论:为保证客运专线整个系统运行的安全可靠性,采用综合接地系统是可行的。 Research purposes: This paper presents general requirement, scope and specification of run - through ground wire, etc. of integrated grounding system. It has a significant meaning to satisfy construction demand of basic works in the civil engineering for passenger dedicated railway line at present. Research methods:Integrated grounding system for passenger dedicated line is a complicatedly systematical project. Through making analysis of system's necessity and feasibility and program research, various groundings will be combined together properly to guarantee equipotential connection between various systems and between various , and reduce the potential differences between different equipments and between different systems and the hidden safety trouble for person and equipment due to potential difference. Research conclusions: In order to guarantee operation safety and reliability of the complete system for passenger dedicated railway line, it is feasible to adopt integrated grounding system.
作者 杨岗
出处 《铁道工程学报》 EI 北大核心 2006年第7期76-80,共5页 Journal of Railway Engineering Society
关键词 客运专线 综合接地 方案 passenger dedicated railway line integrated grounding system program
  • 相关文献

参考文献4

  • 1KieBling,Puschmann,Schmieder.电气化铁路接触网[M].北京:中国电力出版社,2004.
  • 2铁道部工管[2006]18号文.关于印发《客运专线综合接地系统设计原则》(暂行)的通知[Z].2006.
  • 3铁道第二勘察设计院.遂渝线无碴轨道试验段信号阶段试验报告[Z].成都:铁道第二勘察设计院,2006.
  • 4铁道部赴德国轨道电路一次参数测试组.德国(博格、雷达2000)无碴轨道系统轨道电路一次参数测试报告[Z].铁道部赴德国轨道电路一次参数测试组,2005.

共引文献1

同被引文献67

引证文献15

二级引证文献57

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部