摘要
针对矿床地质模型的建立方法以及短期采剥计划CAD系统的开发方法,以AutoCAD 2000为平台,开发了露天矿短期采剥计划CAD系统。该系统主要由矿床地质模型和采剥计划CAD两个主要部分构成。系统中采用的矿岩量计算方法对传统方法进行了改进,实现了计划开采范围内各分岩种工程量以及各种煤质指标计算的自动化。
The method for building the geologic model of the deposit and developing the short-term stripping plan CAD is introduced, besides that, developing the surface mine short-term stripping plan CAD system is developed which was based on the AutoCAD 2000. The surface mine short-term stripping plan CAD system is composed of the geologic model of the deposit and stripping plan CAD. The method of calculating the rock and mineral volume in the system has mended the traditional method, which realizes the automation of the calculation of different rock volume and the coal quality index calculation in the stripping area.
出处
《辽宁工程技术大学学报(自然科学版)》
EI
CAS
北大核心
2006年第5期666-668,共3页
Journal of Liaoning Technical University (Natural Science)
基金
辽宁省教育厅攻关计划项目(20082115)
关键词
露天矿
矿床地质模型
短期采剥计划
CAD
surface mine
geologic model of the deposit
short-term stripping plan
CAD