摘要
以目前国内海上大跨度预制箱梁施工为背景,如东海大桥,杭州湾大桥,上海崇明岛的长江大桥,舟山金塘大桥等,介绍了海上大跨度预制箱梁施工过程和施工方法。
Taking the construction of large span prefabricated box beam bridges on the sea in domestic and oversea at present as examples, such as the Donghai Bridge, the Hangzhou Bay Bridge, the Changjiang Bridge at Shanghai Chongming Island, Zhoushan Jintang Bridge, the author introduces the construction process and construction methods of large span prefabricated box beam on the sea.
出处
《施工技术》
CAS
北大核心
2006年第11期83-85,共3页
Construction Technology
关键词
桥梁工程
箱梁
定位
施工技术
bridge engineering
box beam
location
construction technology