期刊文献+

基于PSP/TSP的软件过程改进框架 被引量:3

PSP/TSP-based Software Process Improvement Framework
下载PDF
导出
摘要 提出在现有的辅助软件过程改进的支撑工具中加入个人级和团队级的软件过程管理及改进的方法,即提出基于PSP/TSP的软件过程改进框架,以期在软件组织中进一步完善软件过程改进作用。在个体过程方面,实现了个体过程计划制定、过程度量数据采集、过程数据分析和估算等功能;同时在团队过程方面,实现了量化的项目进度控制和质量控制。 This paper puts forward the method of integrating PSP and TSP into existing supported tools assisted the software process improvement, which named the PSP/TSP-based software process improvement framework. This method will enhance the framework' s function of software process improvement in software organizations. Some new features, such as personal process planning, process data collection, process data analysis and estimation, are added in the case of PSP. For TSP, quantitative project process management and project quality control is realized.
出处 《计算机应用研究》 CSCD 北大核心 2006年第12期206-208,共3页 Application Research of Computers
关键词 软件过程改进框架 CMMI PSP TSP Software Process Improvement Framework CMMI PSP TSP
  • 相关文献

参考文献11

  • 1屈庆明,赵昊翔,潘金贵.基于生产线方式的软件开发[J].计算机科学,2005,32(4):209-211. 被引量:5
  • 2李存珠 李宣东.软件工程概论[M].南京:南京大学出版社,2001..
  • 3SAMIZAHRAN 陈新译.软件过程改进[M].北京:中信出版社,2002..
  • 4Mark C Paulk,Bill Curtis,et al.Capability Maturity Model for Software version 1.1[R].Techniacl Report,CMU/SEI-93-TR-024,1993.
  • 5CMMI Product Team.Capability Maturity Model Integration for Software Engineering Version 1.1[R].Staged Representation,CMU/SEI-2002-TR-029,2002.
  • 6Will Hayes,James W Over.The Personal Software Process:An Empirical Study of the Impact of PSP on Individual Engineers[R].Technical Report,CMU/SEI-97-TR-001,1997.
  • 7Watts S Humphrey.The Personal Software Process(PSP)[R].Technical Report,CMU/SEI-200-TR-022,2000.
  • 8Watts S Humphrey.The Team Software Process(TSP)[R].Technical Report,CMU/SEI-200-TR-023,2000.
  • 9Noopur Davis,Jim McHale,Watts S Humphrey.Relating the Team Software Process(TSP)to the Capability Maturity Model for Software[R].Technical Report,CMU/SEI-20020TR-008,2003.
  • 10Future2.0[EB/OL].http://www.chinaspis.com/future/Future2Intro.htm.

二级参考文献14

  • 1Mark C.Paulk,HowISO9001 compares with the CMM,IEEE software,January 1995.
  • 2Bergey J,et al. Fourth DoD Product Line Practice Workshop Report: [Technical Report]. CMU/SEI-2001-TR-017
  • 3Brownsword L,Clements P. A Case Study in Successful Product Line Development, CMU/SEI-96-TR-016, ADA315802
  • 4A Framework for Software Product Line Practice Version 4. 2,May 2004. URL: http://www. sei. cmu. edu/plp/frame_report/what. is. a. PL. htm
  • 5Paulk M, et al. The Capability Maturity Model: Guidelines for Improving the Software Process. Reading, MA: Addison-Wesley, 1995
  • 6Phillips D. CMMI Version 1.1: What Has Changed?, Cross talk 15, 2 Feb. 2002.4-6
  • 7Clements P,Northrop L. Software Product Lines: Practices and Patterns. Reading, MA: Addison-Wesley, 2002
  • 8Jones L G,Soule A L. Software Process Improvement and Product Line Practice: CMMI and the Framework for Software Product Line Practice, Technical Note, CMU/SEI-2002-TN-012
  • 9Zubrow D, Chastek G. Measures for Software Product Lines,Technical Note ,CMU/SEI-2003-TN-031
  • 10Ing. Horst Zuse, History of Software Measurement, URL:http ://irb. cs. tu-berlin. de/~zuse/metrics/3-his-t. html

共引文献13

同被引文献17

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部